भेंट का समय-सारणीबंद
सोमवार, जनवरी 12, 2026
SUMMIT One Vanderbilt, 45 E 42nd St, New York, NY 10017, USA
वापस जाएँ history
construction

Building One Vanderbilt: A Quick Construction Timeline in Photos

From foundation to last floors, see how One Vanderbilt rose beside Grand Central—engineering, logistics, and skyline milestones.

11/15/2025
12 min read
Upper floors under construction at One Vanderbilt

One Vanderbilt rose quickly thanks to precise logistics, staged deliveries, and off-site fabrication. This photo timeline highlights key phases from below-grade works to the crown.

Basement works Complex below-grade work around transit lines.


Timeline Highlights

  • Foundations and Below-Grade: Coordination with transit tunnels and utilities.
  • Podium and Early Setbacks: Base massing and street integration take shape.
  • Vertical Rise: Regularized floor plates accelerate steel and facade installation.
  • Upper Levels: Structural tuning for observation spaces and wind performance.
  • Crown and Systems: Final mechanical coordination, lighting, and exterior finishes.

First floors Podium and first setbacks define the base massing.

Summit construction Upper levels prepared for the observation experience.

Tip: For exterior progress-style shots today, stand near the Park Ave viaduct and shoot upward along the taper.

लेखक के बारे में

NYC Observation Deck Expert

NYC Observation Deck Expert

मैंने यह गाइड तैयार किया है ताकि आपकी SUMMIT यात्रा आसान, सारगर्भित और उपयोगी सुझावों से भरपूर हो — आपके परफेक्ट स्काईलाइन मोमेंट के लिए

Tags

Construction
Timeline
Engineering
Photos
Skyscraper

Comments (0)

Leave a Comment

Loading comments...